HS2 Birmingham
Spanning approximately 90km, the delivery of Lot N1 and Lot N2 will include an impressive number of engineering structures, tunnels and earthworks: 51 viaducts and boxes totalling over 14 km and 76 overbridges, 7.5km of twin tunnel, 35 cuttings reaching over 30km, 76 culverts and other underbridges, 66 embankments reaching over 33km, 4 motorway crossings requiring box structures, and 6 interfaces with existing rail requiring both dive-under and overbridge structures. Lots N1 and N2 comprise a total of 1.8 million m3 of concrete and 32 million m3 of cut and landfill.
Understanding change in any project is key. Legacy AM were able to turn around the reporting methodology to give more confidence to the client on cost management, project controls, risk and change .